logo
Send Message
Home > products >
Transformer Tester
>
Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester

Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester

Product Details:
Place of Origin: Xi'an, Shaanxi, China
Brand Name: XZH TEST
Model Number: XHXC105A
Detail Information
Place of Origin:
Xi'an, Shaanxi, China
Brand Name:
XZH TEST
Model Number:
XHXC105A
Degaussing Current:
5A, 1A, 200mA, 5mA Can Be Customized
5A, 1A, 200mA, 5mA Can Be Customized:
Manual, Automatic
Degaussing Time:
Degaussing Time
Degaussing Effect:
Degaussing Effect
Degaussing Progress:
Degaussing Progress
Working Power Supply:
Working Power Supply
Power Frequency:
Power Frequency
Ambient Temperature:
Ambient Temperature
Ambient Humidity:
Ambient Humidity
Weight:
5kg (excluding Test Line)
Trading Information
Minimum Order Quantity:
1 unit
Packaging Details:
Wooden case
Delivery Time:
5-8 work days
Payment Terms:
T/T
Supply Ability:
1000 units/month
Product Description

The power transformer transformer degaussing instrument XHXC105A is a special equipment for eliminating the hazards of residual magnetism after the DC resistance test of large power transformer transformers. It plays an extremely important role in protecting power transformer transformers from the impact of excitation inrush current and ensuring safe operation.

 

Due to the inherent hysteresis phenomenon of ferromagnetic materials, residual magnetism will remain in the iron core after performing operations such as voltage ratio and DC resistance measurements on the power transformer. Due to the existence of residual magnetism, when the transformer is put into operation, the residual magnetism of the iron core will saturate the transformer core for half a cycle, generating a large number of harmonics in the excitation current. This not only increases the reactive power consumption of the transformer, but may also cause the relay protector to malfunction. , causing certain economic losses. Therefore, we must perform degaussing work before the transformer is put into operation to ensure the safe and normal operation of the transformer.

 

XHXC105A fully automatic degaussing verification degaussing instrument adds an automatic degaussing mode based on the original series of products, so users do not have to repeat operations. The size of the LCD module is increased, and the degaussing time test function is added to make the display information richer. Two-button operation: red for selection and reset, green for confirmation and start, making operation more convenient. The degaussing time of the product has been increased from the original 30 minutes to less than 4 minutes.

 

Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 0


Main performance features

★ Adopts patented technology-DC frequency conversion attenuation principle;

 

★ The three-phase transformer can achieve the purpose of degaussing only by degaussing the B phase;

 

★ With automatic flow stabilization judgment and 16-bit AD data acquisition and processing functions;

 

★ With manual/automatic degaussing mode, a total of 5 degaussing modes;

 

★ With degaussing judgment and degaussing result reporting functions;

 

★ Fast degaussing speed - single time increased from 30min to no more than 4min;

 

★ The degaussing effect is obvious - increased from 80% to more than 90% in a single pass;

 

★ The current line for DC resistance testing can be directly used to facilitate matching with DC resistance testing;

 

★ Using English interface, the interface is clear and the degaussing progress is displayed in real time;

 

★ Suitable for eliminating residual magnetism before large-scale power transformers and transformers of 35kV and above are put into operation; especially for large-capacity transformers with voltage levels of 330kV and above;

 

★ This product is small in size and light in weight, making it very suitable for use on site.

 


Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 1

 


English version is available

 

Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 2


Company profile

 

XZH TEST is a professional cable fault detection equipment manufacturer. We are a young team. Our development philosophy is humanized management, intelligent cloud-based products, and internationalized operations. Our development mission is to make electrical equipment free from undetectable failures.

Since its inception in 2013, our company has grown to become one of the largest manufacturer of underground cable fault detection equipment in China. An ISO 9001 and CE certified company, we produces a broad range of testing equipment.

 

What we can do

We have the ability to innovate new products and technologies.

We can provide complete system solutions for your project.

We provide online and offline practical and theoretical training.

We provide instrument repair and calibration.

Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 3Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 4Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 5Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 6

Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 7Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 8Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 9Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 10Demagnetization Effect Verification Fast Three-Phase Test 5A/10A Transformer Demagnetization Tester 11


FAQ

 

1. Are you a trading company or a manufacturer?
We are a professional manufacturer with more than 10 years of experience. We can strictly control the quality of parts and finished products.

 

2. What is the delivery time and inventory?
If our best-selling products are in stock, it will be 5-8 working days for shipment. But for mass production and customized production, the time will take 2-4 weeks.

 

3. What are your payment terms?
Payment ≤ USD 2000, 100% T/T prepayment. Orders over USD 2000 can be negotiated.

 

4. How long is your product warranty?
We provide 1 year warranty for the equipment.

 

5. How do you ensure quality?
The product links include R&D, manufacturing, commissioning and technical support, following strict and scientific management principles. Therefore, we can support strong production and R&D capabilities, and can produce high-quality products at competitive prices to meet customers' high requirements.

 

6. What support can I get?
We will provide training support, marketing support, technical support and supply chain support. You can contact us for more information.

 

7. Where is your factory? Can I visit your factory?
We are located in Xi'an, Shaanxi, China. We are close to Xi'an Xianyang International Airport, which is about 2 and half hours by plane from Shanghai and Guangzhou. All customers from all over the world are welcome to visit us.

 

8. How to become your dealer?
Every company interested in power system instruments can contact us without hesitation, including website letters, emails, telephones, etc. We will contact you quickly according to your company information and cooperation intentions.