2026-08-08
| Cable Ends | One end on utility pole, the other in an outdoor ring main unit (RMU) |
| Cable Route | Unknown (direct-buried installation) |
| Joint Locations | Unknown |
| Insulation Resistance | Phase A: leakage to ground; Phases B & C: normal |
| Additional Notes | Direct-buried cable; termination at utility pole |
Phase A to ground: 0.6 MΩ (failed)
Phases B and C: insulation intact
Not performed — cable path was estimated using electromagnetic field detection on Model 503.
Using the Model 503 acoustic pinpointing device, the fault point was precisely located at 130 meters from the test point. The electromagnetic field detection feature on the 503 unit was instrumental in roughly determining cable position where the route was undocumented.
![]()
Not performed.
Test Personnel: Qiao Yifan & Ge Haojie | XZH TEST Electrical Testing Solutions