The XHHV508-4 DC High Voltage Power Supply System is a next-generation portable cable fault testing solution that integrates a high-frequency DC power supply, external capacitor bank, and precision sphere gap into one ultra-lightweight package. Designed to fully replace traditional heavy test transformers and control boxes, this system is rated for 35kV and below cable fault impulse discharge testing and DC withstand voltage testing. At just 12kg for the main power unit — versus 70kg+ for conventional transformer-based equipment — it represents a revolutionary advance in field-portable high-voltage testing technology.
The complete system consists of three purpose-engineered components, each designed to work seamlessly together while being transportable and serviceable independently.
System Components| Parameter | Specification |
|---|---|
| Model | XHHV508-4 + XHCC-8/15 + XHJX-35 |
| Impulse High Voltage | 0 – 32 kV DC (continuously adjustable) |
| Burn-Through Current | Maximum 320 mA |
| Output Power | 400 W (customizable) |
| External Capacitor | 1 – 16 μF (selectable: 1 / 2 / 4 / 8 / 16 μF) |
| Impulse Time | 1 – 8 seconds (adjustable) |
| Over-Temperature Protection | 65°C (auto-shutdown) |
| Power Supply | AC 220 V ±10%, 50 Hz ±2 Hz |
| Operating Temperature | -20°C to +65°C |
| Power Unit Dimensions | 400L × 310W × 320H mm |
| Power Unit Weight | 12 kg |
| Certification | ISO, CE |
| Brand | XZH TEST |
| Origin | Xi'an, Shaanxi, China |
1. Connect AC 220V power and ensure reliable grounding (ground resistance < 10Ω). 2. Turn on the power switch — the power indicator illuminates. 3. Ensure the voltage adjustment knob is fully counterclockwise (zero position) — the Start button LED will illuminate. 4. Press Start to energize — the Stop button LED illuminates, indicating high voltage is active. 5. Slowly rotate the voltage adjustment knob clockwise while monitoring the kV meter to reach the desired discharge or test voltage. 6. Adjust knob to control discharge interval — clockwise for faster, counterclockwise for slower. 7. After testing: return voltage knob to zero, press Stop, discharge the capacitor using a discharge rod, and apply a ground lead to the HV terminal. 8. Switch off power and stow all test leads.
Packaging & Delivery| Item | Detail |
|---|---|
| Packaging | Reinforced wooden case with internal foam cushioning |
| Delivery Time | 5 – 8 working days |
| Supply Capacity | 2,000 units per year |
| Payment Terms | T/T |
| Warranty | 1 year |