Main Technical Parameters:
1. Low Resistance Fault Simulator: 0Ω~Several Hundreds of Ω
2. Open Circuit Fault Simulator: Several Ω~∞
3. Leakage High Resistance Fault Simulator: Several Ω~Hundreds of MΩ
4. Flashover High Resistance Fault Simulator: Flashover Voltage Range Several kV~Hundreds of kV
5. Continuous Operating Time: 8 hours
6. Operating Conditions:
a. Ambient Temperature: -30℃~ +70℃
b. Relative Humidity (RH) ≤ 85% (25℃)
c. Altitude: h ≤ 1000m
![]()
Simulation Box Structure This power cable fault simulator box consists of four different types of fault simulators (low resistance, open circuit, high leakage resistance, and high flashover resistance). They are arranged parallel to each other within the simulation box, and are insulated from each other and from ground by support insulators mounted on elbow-shaped plug-in components inside the box.
![]()
Precautions for Use
1. This power cable fault simulator box should be reliably grounded and meet the grounding resistance requirements specified in relevant regulations.
2. During simulated fault testing, the rear door of the fault simulator box should be closed to prevent personnel from accidentally entering and being electrocuted by high voltage.