A portable 60 kV, 5 mA DC generator for motor and transformer coil testing, built to be carried to the machine rather than moving the machine to a test bay.
Motor coils, transformer windings and generator bars are tested at DC to find insulation weaknesses that a low voltage resistance check cannot see. The 5 mA output provides enough current to charge a winding in a reasonable time while keeping the set small enough to carry into a plant room.
The set is split into a control box and a multiplier, with the control box carried by one person and the multiplier by another. The high voltage lead, earth lead and discharge rod travel with the set, so the complete test can be set up from one case.
The input is AC 220 V with a tolerance band suitable for site supplies. Where the only source is a portable generator, the generator must hold a stable voltage and frequency; a fluctuating supply makes the output unstable and should be avoided.
Voltage, current and test time are displayed during the run. For a winding test the insulation temperature should be noted with the result, because a reading taken cold and a reading taken after a duty cycle are not directly comparable.
| Configuration 60 kV / 5 mA | Output voltage | Output current | Output power | Charging current | Control box | Multiplier |
|---|---|---|---|---|---|---|
| 60 kV / 5 mA | 60 | 5 | 300 | 7.5 | 11.6 | 2.3 |
| Parameter | Value |
|---|---|
| Voltage measurement error | +/- 1 % (full scale) +/- 1 digit |
| Current measurement error | +/- 1 % (full scale) +/- 1 digit |
| Ripple factor | <= 0.5 % |
| 0.75UDC-1mA button | Precision <= 0.5 % |
| Working mode | 30 min at rated load; 10 min at 1.1 times rated voltage |
The set is two pieces. One person can carry the control box and a second carries the multiplier; a single person moving both in one trip is not recommended.
It can, provided the generator holds a stable 220 V and 50 Hz output. A generator with unstable speed should not be used.
300 W at the 60 kV / 5 mA configuration, which is the figure in the 60/5 technical document.
Tell us the machine rating and where the test will be done, and we will confirm the configuration and the carrying arrangement.